河北省承德县马鞍山水电站,改建于1988年4月,竣工于1989年7月,装机300kW。为了加快施工速度,降低工程造价,在施工中,对二条压力管道的进、出口(喇叭口状),及水轮机室蜗壳等部位,均采用了钢筋肋秫秸模板作法。实践表明,采用上述作法取得了以下几点效果:(1)施工技术简便,易于施工人员操作;(2)用钢筋肋秫秸模板代替木模板或钢模板,可节约木材约13m~3或钢材2.4t,节约资金11,000~16,00元,工期只需5天时间(用工26个)。
Ma’anshan Hydropower Station, Chengde County, Hebei Province, was reconstructed in April 1988 and completed in July 1989 with an installed capacity of 300kW. In order to speed up the construction speed and reduce the construction cost, in the construction, the inlet and outlet of two pressure pipes (bell mouth shape) Practice shows that the above methods have achieved the following results: (1) The construction technique is simple and easy for the construction workers to operate; (2) Replacing the wood formwork or the steel formwork with the steel ribbed straw formwork can save about 13m ~ 3 timber or steel material 2.4 t, saving 11,000 ~ 16,00 yuan of funds, duration only 5 days (26 employment).