论文部分内容阅读
日前,盾构法施工越来越多,也越来越成熟,但在较复杂的施工地段或者城市地面交通难以疏导的路段,往往存在盾构机过暗挖隧道或者过车站乃至平移的现象也越来越多,针对此种现象,我单位发明了一种能够自动进行盾构机过站装置,本文将主要结合本装置在本工程实际中的使用情况进行说明。过站的主要工作盾构机过站,是指将盾构机刀盘及其盾体部分推移到下一个区间的洞门处,然后将剩余台车部分再推过来,将盾体与台车之间的电、液、气等管路进
Recently, more and more construction of shield construction is also more and more mature, but in the more complex construction sites or difficult to ease urban traffic on the road sections, there are often shield tunneling tunnel or over the station and even the phenomenon of translation and also More and more, in view of this phenomenon, I invented a unit that can automatically shield machine over station device, this article will mainly combine the device in the actual use of the project to illustrate. The main work station shield machine over the station, is the shield cutter body and shield body part of the gateway to the next section of the entrance door, and then part of the remaining trolley pushed over again, the shield body and the trolley Between the electricity, liquid, gas and other pipe into