论文部分内容阅读
从近期的许多论文和技术文章以及新设备开发的情况来看,人们对于露天采矿场内破碎机破碎和运输机运输的兴趣正在明显增加。露天采场破碎-胶带运输系统的应用是复杂的。必须对许多因素,诸如矿山设计、生产进度计划、初始投资和持续投资以及生产费用进行彻底的和现实的考察。本文阐述新矿山和现有矿山建立一个总系统必须考虑的基本原理,并评述其若干途径。计划的功用是定出纲要、付诸实施,而设计准则却是确定采矿作业和露天采场破碎-胶带运输系统间的相互关系。
In the light of recent papers and technical articles and the development of new equipment, there is a marked increase in interest in breaker crushing and conveyor transport in surface mining. Open pit crushing - the application of the tape transport system is complicated. Many factors, such as mine design, schedule of production, initial investment and ongoing investment, and costs of production, must be thoroughly and factually examined. This article describes the basic principles that must be considered in establishing a master system for new mines and existing mines and comments on a number of approaches. The function of the plan is to set out the outline and put it into effect. The design criterion is to determine the interrelationship between the mining operations and the open pit crushing-tape transport system.