丙村水电站工程采用分期导流施工,由于开工日期的推延,以及工程建设的需要,对原设计施工导流进行以下两方面的技术优化:①施工导流程序;②高水围堰结构。
Due to the delay of commencement date and the need of construction, the technological optimization of the diversion of the original design and construction is carried out in the following two aspects: ① construction diversion procedures; ② high-water cofferdam structure.