论文部分内容阅读
宝成线北段扩能改造后观音山站上下行出现车机联控不畅的问题,本文提出了利用转发器方案改造感应弱场区的整改措施。
After the reconstruction of the north section of Baocheng Line, Guanyin Mountain Station has a problem that the vehicle control system is not well linked up and down. This paper presents the rectification measures of using the transponder scheme to transform the induction weak field area.