对轻型井点降水技术用于尾矿坝降低浸润线的有关工程施工问题,作了详细的介绍。目前,我国已建成投产的尾矿坝,绝大多数是用上游法堆筑的尾矿坝。这类坝的下游坡普遍存在因渗流不畅,而产生浸润线过高、逸出,甚至管涌等问题,严重地影响矿山生产。为解决尾矿坝的排渗问题,于1984年由马钢南山铁矿和冶金部建筑研究总院共同协作,将宝钢地基降水获得显著成效的轻型井点移植到凹山尾矿坝上作开拓性尝试。
A detailed introduction is given to the related engineering construction problems of light well point precipitation technology used in tailings dam to reduce infiltration line. At present, China has completed the put into operation tailings dam, the vast majority of tailings dam is built by the upstream method. The downstream slopes of such dams are generally experiencing problems such as poor seepage and overflowing lines, escapes and even piping, which seriously affect the production of mines. In order to solve the problem of draining seepage of tailings dam, in 1984, Masteel Nanshan Iron Mine and the Metallurgical Construction Research Institute jointly worked together to transplanting the light well with significant effect of Baosteel foundation precipitation to the pioneering tailings dam in the city of Yaoshan. try.