论文部分内容阅读
在铁路客运专线高速发展的今天,采用无砟轨道施工技术已成为客专线路施工的主要方法。通过对3种无砟轨道施工物流组织方法的比较,提出了合理的优化措施和建议,为施工方法的选择提供参考。
In the rapid development of railway passenger dedicated line today, the use of ballastless track construction technology has become the main method of passenger line construction. Through the comparison of three kinds of non-orbital construction logistics organization methods, put forward reasonable optimization measures and suggestions for the selection of construction methods to provide a reference.