论文部分内容阅读
1破碎与运输系统的变更本钢南芬露天矿采矿场推进水平越来越接近铁路车辆装车的平峒,现有的平峒和溜井开拓运输系统即将报废。根据国家计委和冶金部批准的设计方案将采用汽车——破碎——铁路联合运输的矿石开拓运
1 crushing and transportation system changes Benben Nanfen surface coal mine pushing the level of mining trucks closer and closer to the level of loading, the existing Pingtung and Chiu mine development and transport system is about to scrap. According to the State Planning Commission and the Ministry of Metallurgical approved the design will be used car - broken - rail joint transport of ore to open up transport