目前现行的建筑工程预算定额中的人工工日标准,是以前城乡建设环境保护部颁发的《全国建筑安装工程统一劳动定额》(下称《劳动定额》)为基础,加上10%的定额幅度差,按分部分项定额工作内容综合而成的。《劳动定额》土建部分共有14个分册,包括材料运输与材料加工、人力土方工程、架子工程、砌体工程、木作工程、模板工程、钢筋工程、混凝土工程、防水工程、金属制品制作及安装、抹灰工程、木装饰工程、油漆工程和玻璃工程。除定额总说明对各
At present, the artificial labor day standard in the current budget for construction projects is based on the “Unified Labor Quota for the National Construction and Installation Project” (hereinafter referred to as “labor quota”) issued by the Ministry of Urban and Rural Construction and Environmental Protection, plus a fixed margin of 10%. Poor, based on the content of the work of the sub-item fixed and integrated. There are a total of 14 sub-volumes in the civil work section of “Labor Quota,” including material transportation and material processing, manpower earthworks, shelf engineering, masonry work, wood work, formwork engineering, steel reinforcement engineering, concrete engineering, waterproof engineering, and metal product fabrication and installation. , plastering works, wood decoration works, paint works and glass works. In addition to the total quota for each