由甘肃省电力试验研究所、哈尔滨大电机研究所与盐锅峡水电厂通力合作,在甘肃省电力工业局组织、领导和积极支持下,于黄河岸边建成了盐锅峡增压式水机磨蚀试验台.该台于1990年11月1日至3日通过省级鉴定。通过资料审查和现场测试、专家评定等方式,鉴定委员会认为,该试验台的设计构思新颖、结构简单、布局合理、易于操作,具有独创性.对我国黄河等多泥沙河流上的水力机械抗磨蚀、安全经济运行和
By the Gansu Provincial Institute of Electric Power Test, Harbin Institute of Electrical Engineers and Salt Lake Gorge power plant full cooperation in Gansu Provincial Electric Power Industry Bureau of the organization, leadership and active support, built in the Yellow River bank Yanbu Gully pressurized water machine Abrasion test stand. The station in November 1, 1990 to 3 provincial-level appraisal. Through the methods of data review, on-site testing and expert evaluation, the appraisal committee believes that the design of the test bed is innovative in design, simple in structure, rational in layout, easy in operation and original in origin. Abrasion, safe and economical operation and