论文部分内容阅读
2006年12月11日星期一晴上班后,督导室接到东赵村民情信息员的电话,反映村民赵某要在自己家的责任田里建设蒜片加工厂,与他邻地的宋某认为建设蒜片加工厂遮挡阳光,影响自己的大蒜生长,并且污水得不到处理,破坏土壤会造成减产,不同意赵某建,两边闹得很僵,矛盾一触即发,要求乡里迅速派人到现场进行处理。
Monday, December 11, 2006 After working fine, the steering room received a phone call from the East Zhao Village Information Worker, reflecting that the villager Zhao should establish a garlic processing factory in the responsibility of his own home and work with his neighbor Song That the construction of garlic processing plant to block the sun, affecting their own garlic growth, and sewage treatment, destruction of soil will result in reduced production, do not agree Zhao Moujian, both sides very stiff, contradictions at any moment, requiring the township quickly sent to the scene For processing.