概述采用分段分组快速测量法测量山区公路,要分三个大组,深感各专业组的项目多人员少。为了测设和施工需要,故各项外业工作不能同时进行。如我们测量兴巴公路的初期,除选钱水平不停外,其余是先搞中线后搞地形描绘和地物调查及横断面测绘与材料调查等工作。这样每段路线都需两次才能完成,影响进度。经各组的职工及时总结经验,发动大家动脑筋、想办法、献计策,终于在集体的创造下,把分段分组快速测量法向前推进一步,即现在采用的多工种多项目一次完成作业法。通过兴巴公路施测的结果,这种方法基本上是成功的。兹将该法执行的情况分别介绍如后:
Overview The use of sub-grouping rapid measurement of mountain road measurement, to be divided into three large groups, each professional group deeply less than the project staff. In order to measure and construction needs, so the work of the field can not be carried out simultaneously. If we measure the initial stage of Xingba Road, in addition to non-stop election level, the rest are engaged in the first line after doing topography and terrain mapping and cross-sectional mapping and materials research work. This way each route needs to be completed twice, affecting the progress. After the group of workers summarize the experience in a timely manner, mobilize all brains, think of ways, dedication, and finally in the collective creation, the sub-group fast measurement method to move forward one step forward, that is now used in a variety of multi-type multi-project to complete the homework law. This method is basically successful through the results of the test on XingBa highway. The implementation of the law are hereby introduced as follows: