论文部分内容阅读
为适应争创一流电力企业的需要,推动企业的技术进步,我们于1997年建成了莒南电力总公司综合自动化系统,现简介如下。1网络结构该系统由自动化监控系统(SCADA)、管理信息系统(MIS)和电量电费管理系统(ECMS)三部分组成。如附图所示。2硬件配置服务器:ASTMANHATTANG590?
In order to meet the needs of striving for the first-class electric power enterprises and promoting the technological progress of the enterprises, we built the comprehensive automation system of Taonan Electric Power Corporation in 1997. The brief introduction is as follows. 1 network structure The system consists of automated monitoring system (SCADA), management information system (MIS) and electricity tariff management system (ECMS) composed of three parts. As shown in the figure. 2 hardware configuration server: ASTMANHATTANG590?