南桥变电站是我国第一座规模最大、投资最多、技术最先进的超高压直流输电工程,是国家“七五”期间能源建设的重点工程。该工程于一九八五年十二月正式破土动工,一九八六年十二月土建交付安装,工期提前六个月。一九八九年九月正式投入生产运行。经能源部直流输电总指挥部、上海市质监站石化地区分站、建设和运行等单位的验收评定,工程质量全部评为优良,被上海市评为一九八九年度优质工程,并获得一九八九年度建筑工程鲁班奖。一、工程概况南桥站座落在上海市奉贤县邬桥乡境内,是淮南一上海,葛洲坝-上海,徐州-上海的三条
Nanqiao Substation is China’s first large-scale, most-invested and most technologically advanced UHV DC transmission project, and is a key project for energy construction during the national “7th Five-Year Plan” period. The project officially broke ground in December 1985 and the civil works were delivered and installed in December 1986. The construction period was six months ahead of schedule. In September 1989, it officially went into production. Through the acceptance assessment of the Ministry of Energy’s DC Transmission Headquarters, the Shanghai Quality Supervision Station petrochemical district sub-station, and the construction and operation of the project, the quality of the project was rated as excellent, and Shanghai was awarded the 1989 annual quality project and obtained The 1989 Luban Award for architectural engineering. I. Project Overview Nanqiao Station is located in the town of Fengqiao County, Fengxian County, Shanghai. It is one of Huainan-Shanghai, Gezhouba-Shanghai, and Xuzhou-Shanghai.