论文部分内容阅读
如东——位于江苏省东南部、长江三角洲北翼,其东面和北面濒临南黄海,是中国开发海上风电的绝佳区域。在如东县环港外侧离岸3至15公里的海面,155台巨大的白色风机傲然矗立。安装在90多米高的塔筒上的叶轮,迎着海风徐徐地旋转起舞。这里是中国国电集团公司建设的亚洲最大海上风电场,总容量达48.2万千瓦,占据了国内60%份额。如东的风电场属于潮间带风电场,其建设过程与潮汐规律息息相关。潮汐是受月亮影响的,每天涨落两次,第二天比第一天推迟一个小时左右,15天为一个周期。因为要在涨潮时移船运输,落潮
Rudong - Located in southeastern Jiangsu Province, the northern wing of the Yangtze River Delta, to the east and north to the South Yellow Sea, is an excellent area for developing offshore wind power in China. In Rudong County, the outer ring 3 to 15 km off the coast of the sea, 155 huge white turboprop stands proudly. Installed in more than 90 meters tall tower impeller, facing the sea breeze slowly rotating dance. Here is the largest offshore wind farm in Asia built by China Guodian Corporation with a total capacity of 482,000 kilowatts, accounting for 60% of the domestic share. Rudong wind farms belong to the intertidal wind farm, and its construction process is closely related to the tidal law. Tides are affected by the moon, fluctuating twice daily, the next day delayed about an hour than the first day, 15 days for a cycle. Because of the high tide shift ship transport, ebb