合肥滨湖会展中心登录大厅为新型的大跨度拱形管桁刚架空间网格钢结构,主拱桁架柱脚通过抗震支座与下部基础连接,主拱桁架梁与预应力混凝土基础梁构成自平衡受力体系。采用MIDAS软件对登录大厅钢结构施工全过程进行了仿真模拟,确定了分段吊装和高空散装相结合的综合施工方法。总结了主拱桁架柱、主拱桁架梁的安装技术,研究了拱桁架预应力基础梁张拉控制方法,并对承重支架卸载过程中结构关键构件应力的实测值与计算值进行了比较,该施工技术可为我国类似工程的设计和施工提供参考。
Hefei Binhu Convention and Exhibition Center log-in hall for the new long-span arch pipe truss frame space grid steel structure, the main arch truss column foot through the foundation and the lower bearing connection, the main arch truss girder and prestressed concrete beams constitute the basic Balance force system. MIDAS software was used to simulate the whole process of steel structure construction in the log-in hall, and the comprehensive construction method of combining hoisting with high-altitude bulk was determined. The main arch truss columns and the main arch truss girder are installed. The tension control method of prestressed arch girders of arch truss is studied, and the measured and calculated values of the stress of the key structural members in the process of unloading are compared Construction technology can provide reference for the design and construction of similar projects in our country.