Reserve estimation of the high phosphorous stockpile at the Choghart iron mine of Iran using geostat

来源 :Mining Science and Technology | 被引量 : 0次 | 上传用户:listen342325
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
An attempt to estimate the reserves in the High Phosphorous stockpile (HP) at the Choghart Iron mine of Iran was car-ried out using geostatistical modeling. Grade and tonnage estimates of ore stockpiles can help convert them into a valuable ore re-serve. This is valuable in consideration of increasing metal demand, and the depletion of in situ ore reserves, around the world. Estimation of reserves in stockpiles is difficult partly because of geological and grade discontinuities created during the dumping of the ore piles. Data input for the HP stockpile at Choghart was performed based upon pre-existing information gathered during ex-traction from the various mining benches. After establishing the input data files the reserve estimates were found using geostatisti-cal methods aided by the international mining software SURPAC. The stockpile was divided in to three domains and the reserves in each domain were estimated separately. A grade block model was used to compute the reserve. Fe% and P% were estimated using the Ordinary Kriging method. The results showed that the total tonnage of the HP stockpile is 4.5 million tons with an average grade of 55% Fe and 1.03% P. An attempt to estimate the reserves in the High Phosphorous stockpile (HP) at the Choghart Iron mine of Iran was car-ried out using geostatistical modeling. Grade and tonnage estimates of ore stockpiles can help convert them into a valuable ore re-serve. This is valuable in consideration of increasing metal demand, and the depletion of in situ ore reserves, around the world. Estimation of reserves in stockpiles is difficult partly because of geological and grade discontinuities created during the dumping of the ore piles. Data input for the HP stockpile at Choghart was done based on pre-existing information gathered during ex-traction from the various mining benches. After stocking the input data files the reserve estimates were found using geostatisti-cal methods aided by the international mining software SURPAC. The stockpile was divided in to three domains and the reserves in each domain were estimated separately. Fe% a nd P% were estimated using the Ordinary Kriging method. The results showed that the total tonnage of the HP stockpile is 4.5 million tons with an average grade of 55% Fe and 1.03% P.
其他文献
期刊
期刊
随着社会的进步和科学技术的持续发展,PLC控制技术已经广泛的应用于各种电气化领域中.本文开始将对PLC及其特点进行一个简单的介绍,然后将PLC技术在各个自动化控制中的应用进
期刊
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
简述了在满洲里新巴尔虎右旗额仁陶勒盖银矿区遇到的破碎带、井漏复杂地层的采用注水泥浆护壁堵漏的可行性,详细阐述注浆施工工艺流程及水泥浆配浆水灰比.
期刊