随着经济体制改革的深入、国家对基本建设管理体制改革制定了不少法规,要求大力推行工程招标承包制.本着此精神,我司受建设单位的委托,对理塘金厂沟金矿250#采井船工程进行招标.首先,组成由建设单位、设计院、特邀单位及我司人员参加的招标小组,制定了有关文件,向有关船厂发出招标通知.我们将理塘金厂沟金矿地处海拔4000米以上的川藏高原上,存在着海拔高、气压低、空气稀薄、年平均气温低、运输距离(距成都680公里)当地无机
With the deepening of the reform of the economic system, the state has formulated a number of laws and regulations on the reform of the capital construction management system, requiring vigorous implementation of the project bidding contracting system. In this spirit, our company is entrusted by the construction unit to conduct research on the gold deposits 250 # mining vessel project bidding.First, the composition of the construction unit, design institute, invited units and our staff to participate in the tender team to develop the relevant documents to the shipyard issued a tender notice we will Litang Gold Factory ditch The gold mine is located in the Sichuan-Tibet Plateau above 4000 meters above sea level with high altitude, low pressure, thin air, low average annual temperature and transport distance (680 km from Chengdu)