论文部分内容阅读
根据盘石头水库输水洞弧形工作门急流控制试验对高水头、小流量弧门控泄急流控制问题中水舌脱底散射的原因进行了初步分析,并对工程设计中应注意的问题进行了讨论。
According to the control experiment of the curved gate work of water diversion tunnel in Panshitou reservoir, the reasons of water-tongue tapping off in high-head and small-flow arc-gated vent-flow control are analyzed preliminarily, and the problems that should be paid attention to in engineering design are analyzed Discuss.