论文部分内容阅读
随着我国经济的不断发展,桥梁建设也得到了快速地发展,国家相关部门对桥梁的建设问题更为重视。桥梁的建设,在很早就开始,直到20世纪以后,随着公路交通的发展,使得桥梁飞速发展起来,桥梁的建设不仅仅在峡谷与河流上,城市中的立交桥更为多见。桥梁的大力兴建,使得对人力、物力以及财力的要求更高,然而这些都匮乏的情况下,只能不断地提高建设桥梁的技术水平,引入先进的材料与技术。T梁预制在桥梁建设中的应用,是目前较为广泛的工程,然而T量预制的质量影响着整个桥梁工程,本文将对桥梁中T梁预制施工的质量控制措施进行探讨。
With the continuous development of our economy, the construction of bridges has also been rapidly developed. Relevant departments of the state pay more attention to the bridge construction. The construction of bridges began very early. Until the 20th century, with the development of highway traffic, the bridges developed rapidly. The construction of bridges was not only in canyons and rivers, but also in overpasses in cities. The vigorous construction of the bridge has made it more demanding of manpower, material resources and financial resources. However, in the absence of these, it can only continuously improve the technological level of building bridges and introduce advanced materials and technologies. T beam prefabricated in the construction of the bridge is currently a more extensive project, but the quality of T prefabricated the entire bridge project, this paper will be on the bridge T beam prefabricated construction quality control measures are discussed.