论文部分内容阅读
2009年11月,首钢矿业公司计控检验中心成立以自动化专业技术带头人马著为负责人的杏山地采自动控制系统研发小组,向建设国内一流、国际领先的地下采矿自动控制系统发起挑战。随着杏山地采自动化项目的推进,2014年下半年开始,计控检验中心制定了电机车远程遥控驾驶、电机车精确定位及自动运行等中远期攻关课题。如果引进国外产品,就要全套引进,不仅成本高,动辄几千万,而且国外设备与国内设备
In November 2009, Shougang Mining Corporation CCCPC set up a research and development team of automatic control system of Xingshan Mining, which takes the lead of professional and technical automatization leaders and challenges the construction of the first-class and international leading underground mining automatic control system. With the advancing of Xingshan Mining automation project, in the second half of 2014, the C & C Testing Center has formulated the medium and long-term research topics such as remote control of electric locomotive, precise positioning of electric locomotive and automatic operation. If the introduction of foreign products, it is necessary to introduce a full set, not only costly, easily tens of millions, and foreign equipment and domestic equipment