水利水电工程造价既有一定的稳定性,同时又具有不确定性,三峡工程规模大、工期长、工程投资大,工程实施期间,国际国内的政治经济环境不断变化,不断地影响着工程造价的稳定。在三峡二期工程的建设当中,我国的市场经济改革与法制建设进一步深化与完善,出台了一系列法律法规与行业政策,对工程造价产生了影响,同时也提出了工程造价应科学动态管理的要求。
The cost of water conservancy and hydropower projects has both stability and uncertainty. The Three Gorges Project has a large scale, a long construction period and a large investment in construction. During the implementation of the project, the political and economic environments at home and abroad are constantly changing, continuously affecting the project cost stable. During the construction of the second phase of the Three Gorges Project, China’s market economy reform and legal system construction further deepened and perfected. A series of laws, regulations and industrial policies were promulgated, which had an impact on the project cost. Meanwhile, the project cost should be scientifically and dynamically managed Claim.