为了使我国工业企业建设项目的“三同时”预评价工作走上科学化、规范化的正常轨道,卫生部已于1994年公布了《工业企业建设项目卫生预评价规范》。但是,目前对于此规范中的综合指数法应用尚未引起足够的重视。本文采用此规范中的综合指数法对某大型炼油工程竣工生产...
In order to make the “three simultaneous” pre-evaluation work of industrial projects in China embark on a scientific and standardized normal track, the Ministry of Health released the “Regulations on Hygienic Pre-evaluation of Construction Projects of Industrial Enterprises” in 1994. However, at present, the application of the composite index method in this code has not drawn enough attention. This article uses the specification of the comprehensive index of the completion of a large oil refinery production ...