论文部分内容阅读
题记:7月27日,上海电气临港核电设备制造基地彩旗飘扬,一个长20.995米、最大直径4.435米、重达335吨的庞然大物正被徐徐托运出厂房,它就是60万千瓦核电机组的蒸汽发生器,将被运往秦山核电站二期扩建工程。这个巨无霸装备,历时两年多时间经过数千道关键工序,顺利地在上海电气核电设备有限公司完成,它的诞生标志着上海临港核电基地开始形成生产能力。那么这台设备是如何诞生,它有怎样的质量保证,带着这样的疑问,记者来到临港新城,来到上海电气核电设备有限公司探寻其中的故事。
Inscription: July 27, Shanghai Electric Lingang nuclear power equipment manufacturing base flags flying, a 20.995 meters long, the largest diameter of 4.435 meters, weighing 335 tons of the monster is being checked out of the plant, which is 600,000 kilowatts of nuclear power plant steam Generator, will be shipped to Qinshan Nuclear Power Station Phase II expansion project. This giant device, which lasted more than two years after thousands of key processes, was successfully completed at Shanghai Electric Nuclear Power Equipment Co., Ltd. It marks the birth of Shanghai Lingang Nuclear Power Base to form a production capacity. So how is this equipment born, what kind of quality assurance is it? With such questions, the reporter came to Lingang New City and came to Shanghai Electric Nuclear Power Equipment Co., Ltd. to explore the story.