论文部分内容阅读
溪洛渡和向家坝水电站是金沙江一期开发的工程项目。项目业主负责前期工作 ,在组织编制可行性研究报告时 ,根据两个阶段的要求采取两种不同的管理模式。在发挥业主主导作用与中介机构咨询作用方面进行了有益的探索
Xiluodu and Xiangjiaba Hydropower Station is a Jinsha River development project. The project owner is responsible for the preliminary work. When organizing the feasibility study report, two different management modes are adopted according to the requirements of the two phases. In the play owner-led role and agency advisory role has conducted a useful exploration