建设工程过程控制有投资、进度(或工期)、质量三大目标,它们之间是既相互联系又相互制约、既相互对立又相互统一的关系。如加大质量投入,相应地会造成进度的减慢和费用的增加;加快进度,相应会造成质量的下降和投资费用的增加;控制投资费用,相应会造成质量的下降和进度的减慢。在当今“以经济建设为中心,时间就是效益”的年代,一些建设单位片面追求经济效益,进度(或工期)目标的确定缺
Construction project process control investment, progress (or duration), quality of the three major objectives, they are both interrelated and mutual restraint, both antagonistic and mutually unifying relations. Such as increasing the quality of inputs, which will result in the corresponding slowdown and increase the cost; speed up the progress, the corresponding will result in a decline in the quality and investment costs increase; control investment costs, the corresponding will result in the quality of the decline and progress slowed down. In today’s era of “economic construction as the center, time is efficiency,” some construction units unilaterally pursued economic benefits and the determination of the goal of progress (or duration) is lacking