复兴门立交上部结构采用钢绞线预应力后张工艺。原拟采用703锚具,但由于某些客观条件的限制,未能实现。在试验703锚具的过程中,我们发现钢绞线嵌入锚塞上的线槽后产生相当大的摩阻力,受这一现象的启示,并考虑到其它因素,决定采用钢制锚围、并在内壁设置嵌线槽,而锚塞则改为光面、并适当减少锥度,以提高顶锁效果,改善锚固性能,减少飞销的可能。
The Fuxingmen overpass upper structure adopts strand prestressed post-tensioning technology. It was originally intended to use 703 anchors, but due to certain objective conditions, it has not been implemented. During the trial of the 703 anchors, we found that the steel strands had considerable frictional resistance after embedding in the trunkings on the anchor plugs. In view of this phenomenon, and taking into account other factors, it was decided to use steel anchors and In the inner wall, there is a ruled groove, and the anchor plug is changed to smooth, and the taper is reduced appropriately, so as to improve the effect of the top lock, improve the anchorage performance, and reduce the possibility of flying.