舞水二桥为一座V型刚构连续梁桥,V型墩夹角大,0号块箱梁长29 m且墩身位于深水中,施工难度大,施工工艺复杂。着重介绍了0号块箱梁的施工方案及现场控制。
Wujiang Bridge is a V-shaped rigid frame continuous beam bridge. The V-shaped pier has a large angle. The No. 0 block beam is 29 m long and the pier body is located in the deep water. The construction is difficult and the construction process is complicated. The construction plan and on-site control of No. 0 box girder are emphatically introduced.