论文部分内容阅读
现代机载雷达中运用高平均功率管子的经验表明,管子之所以损坏,往往是由管子——发射机——用户之间配合问题造成的,而不是管子本身。对这种问题,不仅管子设计者有责任,而且电源设计者、系统设计者以及维护人员也都有责任。对该问题的忽视,无论对用户还是对制造者都会造成很大的浪费。本文拟对此问题的一些方面加以论述,并提出一些减少配合不良问题的方法。
The experience of using high average power tubes in modern airborne radars has shown that tubes are damaged, often due to tube-transmitter-user mating problems, not the tube itself. It is not only the pipe designer's responsibility for such a problem, but also the power designer, system designer and maintenance personnel. Neglecting this issue can result in significant waste for users and for manufacturers. This article intends to address some aspects of the issue and suggests ways to reduce the problem of poor coordination.