靖会电力提灌工程二泵站已运行了24年,由于当时历史条件所限,加之泵站机电设备逐渐老化,泵站已达不到原设计能力。是典型的高耗能,低效率泵站。改建设计遵循的原则是尽量利用已有的水工建筑物,更换老化严重、高耗低效的机电设备,并对主厂房、前池、出水塔进行相应的调整改建,扩建副厂房。通过对该泵站改建设计的介绍,为电力提灌工程中高耗能泵站的改造积累经验。
Jinghui Electric Power pumping project two pumping station has been running for 24 years, due to the historical conditions at the time, combined with pumping station aging mechanical and electrical equipment, pumping stations have reached the original design capacity. Is a typical high-energy, low efficiency pumping station. The principle of retrofitting design is to make full use of the existing hydraulic structures to replace the electromechanical equipment with serious aging, high consumption and low efficiency, and to adjust and rebuild the main workshop, front pond and outlet tower accordingly and expand the auxiliary workshop. Through the introduction of the design of the pump station reconstruction, experience has been accumulated for the reconstruction of high energy-consuming pump stations in the electric pumping project.