论文部分内容阅读
第二冶炼厂是金川公司主流程中以湿法精炼为主的最终产品生产单位.1994年以来,全面开展创建“无泄漏工厂(车间)”活动,首批进入公司“无泄漏工厂“行列.1995年经过巩固与提高,通过了兰州公司‘’无泄漏工厂”的检查验收,成为兰州公司系统首家“无泄漏工厂”.一、领导重视,全面动员,掀起创建”无泄漏工厂(车间)”的热潮第二冶炼厂工艺流程长,拥有各类机电设备2240台(套)、各种管道102760.8米及大小阀门9635个.高温、烟尘、氯气以及各种酸碱的腐蚀和影响,给设备管理造成很大的困难.1994年8月,公司明确要求第二冶炼厂年底必须进入“无泄漏工厂”的行列.厂领导班子认为,虽然任务艰巨,但也为全面提高企业管理水
The second smelter is the final product manufacturing unit mainly focused on wet refining in the main process of Jinchuan Co., Ltd. Since 1994, it has started the “No Leakage Factory (Workshop)” campaign in an all-round way and entered the first batch of “Leak-less Factory”. After its consolidation and improvement in 1995, it passed the inspection and acceptance of Lanzhou Company’s “No Leaky Factory” and became the first “No Leaky Factory” of Lanzhou Company System. (1) The leaders paid attention to the full mobilization and set off a “Leak-less Factory (Workshop) ”The second smelter long process, with all kinds of mechanical and electrical equipment 2240 Taiwan (sets), all kinds of pipes 102760.8 meters and the size of the valve 9635. High temperature, smoke, chlorine and a variety of acid-base corrosion and impact to the equipment Management caused great difficulties in August 1994, the company explicitly requires the end of the second smelter must enter the ranks of “plant leakage.” Plant leadership believes that although the task is arduous, but also to improve the overall management of water