论文部分内容阅读
本文以某连续箱梁桥专项加固施工为背景实例,介绍了预应力连续箱梁桥过渡墩盖梁开裂加固方案设计以及施工过程,为今后类似桥梁的养护维修提供参考依据。
In this paper, a continuous reinforced concrete box girder bridge construction as an example, the paper introduces the design and construction process of the crack reinforcement plan for the transitional pier roof girder of prestressed continuous box girder bridge, and provides references for the future maintenance and repair of similar bridges.