论文部分内容阅读
本文在综述各种调度方法的基础上,采用仿真、优先规则和专家系统结合的方法,实现柔性制造系统(FMS)调度。文中讨论了影响调度的因素,确定了评价调度的标准、优先调度规则和调度模型,给出了实验结果。
Based on the review of various scheduling methods, this paper adopts the method of simulation, priority rules and expert system to realize the flexible manufacturing system (FMS) scheduling. In this paper, the factors affecting scheduling are discussed, the criteria of evaluation scheduling, priority scheduling rules and scheduling model are determined, and the experimental results are given.