2013年度,101室开展了101堆运行维护及相关工程项目。工程项目主要包括101反应堆最终安全停闭过渡期综合治理工程项目(综合治理项目)、“十一五”乏燃料外运项目和废水罐应急安全整治项目实施,以及101堆退役和“十二五”乏燃料外运项目建议书编写。1运行维护根据2013年检修计划完成了以下内容:运行、维护排风系统风机;运行、维护空气取样监测系统;维护重水泵甲、乙、丙;维护剂量泵甲、乙和相关管道、阀门;维护1、2、3号真空泵;检
In 2013, Room 101 ran 101 heap operation and maintenance and related projects. The project mainly includes the comprehensive control project (comprehensive treatment project) for the final safe shutdown and transition of 101 Reactor, the implementation of the “Eleventh Five-Year” Spent Fuel Outbound Project and the emergency safety remediation project of waste water tank, as well as the 101 pile decommissioning and the “ Twelfth Five-Year ”Spent Fuel Outsourcing Project Proposal written. 1 Operation and Maintenance According to the 2013 maintenance plan, the following contents were completed: operation and maintenance of ventilation fan; operation and maintenance of air sampling and monitoring system; maintenance of heavy water pumps A, B and C; maintenance of pump A, B and related pipes and valves; Maintenance of 1,2,3 vacuum pump; seized