2015年9月开工建设吉林省松花江干流治理工程,治理河道长度441.5千米,计划于2017年底完成主体工程。该工程是国务院确定的全国172项重大水利工程之一,也是吉林省“十三五”期间需要完成的11项重大水利工程之一。
In September 2015, construction of the Songhua River Mainstream Control Project in Jilin Province was started and the length of the river was controlled at 441.5 km. The main project is scheduled to be completed by the end of 2017. The project is one of the 172 major water conservancy projects set by the State Council and one of the 11 major water conservancy projects to be completed during the “13th Five-Year Plan” period in Jilin Province.