1“空泡应力腐蚀”情况1.1基本情况某电厂3号炉系超高压自然循环煤粉炉,于1989年8月投产。2009年1月4日发现水冷壁折焰角部位爆管,经临时处理后又投入运行;2009年1月22日另一处折焰角水冷壁又出现爆管。停炉后全面检查发现:1)距折焰角弯头约1 m处,沿斜坡往上约15 m范围内有97根水冷壁管圆弧顶面出现纵向线性减薄(B段管子相对应的斜坡区域减薄均严重,如图1所示)。2)对爆管管段取样宏观检查,在管子内壁圆弧顶面出现纵向线性沟槽。如图2、图3、图4所示。
1 “vacuolar stress corrosion ” situation 1.1 The basic situation A power plant No. 3 Department of ultra-high pressure natural circulation pulverized coal furnace, put into operation in August 1989. On January 4, 2009, it was found that the squib at the corner of the water wall fracturing angle was put into operation after being temporarily treated. On January 22, 2009, another squib was formed at another fracturing angle water wall. A comprehensive examination after shutdown revealed that: 1) there was a longitudinal linear thinning of 97 water-wall tube arc tops at about 1 m from the bend angle elbow and about 15 m along the slope Of the slopes are severely thinned, as shown in Figure 1). 2) Macro-examination of the pipe burst section, longitudinal linear groove appears on the top of arc of the pipe wall. As shown in Figure 2, Figure 3, Figure 4 shows.