一、嘉定县娄塘公社的自来水厂水厂占地面积1,300米~2,厂内主要设备有:1、综合泵房一幢,面积72米~2(包括加药室和值班室)。2、水泵4台装于泵房内,其中一级泵2台,流量45米~3/时,一级泵2台,流量45米~3/时。3、悬浮澄清池一座,外形尺寸3.08×6.50×4.50米,净水能力70米~3/时。4、重力式快滤池一组,面积8米~2。5、清水池一座,直径8米、贮水100米~3。6、20米高水塔一座,容量50米~3,输水管网3,100米。水厂日产水量1,200吨。工程总造价为10万元。
1. The waterworks waterworks of the Rongtang commune of Jiading County covers an area of 1,300 meters~2. The main facilities in the plant are: 1. A comprehensive pump room with an area of 72 meters to 2 meters (including the dosing room and the duty room). 2. Four pumps are installed in the pump room, including two primary pumps with a flow rate of 45m~3/hr and two primary pumps with a flow rate of 45m~3/h. 3. One suspension clarifier, external dimensions 3.08×6.50×4.50 meters, water purification capacity 70 meters~3/hour. 4. A group of gravity-type fast filter tanks, with an area of 8m~2.5m, a clear water tank, 8m in diameter and 100m to 3~6 in water storage capacity, a water tower of 6, 20m, a capacity of 50m~3, and a water supply pipe The net is 3,100 meters. The water production capacity of the water plant is 1,200 tons. The total project cost is 100,000 yuan.