三峡电站首批四台700MW机组顺利投产发电,水电八局安装调试的2号机组率先启动,成为国内首台投产发电的700MW水轮发电机组;3号机组创造了大型水轮发电机组启动试运行时间最短的世界记录。本文对启动试运行的组织实施进行介绍和分析,为国内水电站同类大型机组启动试运行工作提供一些有益的资料。
The first units of the Three Gorges power station, Sishi 700MW, were put into operation successfully. The Unit 2, with installation and commissioning of hydropower, eight plants, was the first to be started up and became the first 700MW hydro-generating unit to be put into operation in China. Unit 3 created a large-scale hydro-generating unit to start trial operation The world record of the shortest time. This paper introduces the introduction and analysis of the implementation of the commissioning of the organization to provide some useful information for the start-up of commissioning of similar large units in the domestic hydropower station.