【摘 要】
:
黄河下游河道表层及深层床沙测验于 1998年汛前开始 ,具有较高的控制性及测验精度。通过对实测资料的系统分析 ,阐述了床沙级配的沿程及沿深度的变化特点 ,并首次利用床沙级
【机 构】
:
黄河水利委员会勘测规划设计研究院!河南郑州450003,河南黄河河务局!河南郑州450003,河南黄河河务局!河南郑州450003,黄河水利委员会勘测规划设计研究院!河南郑州450003
论文部分内容阅读
黄河下游河道表层及深层床沙测验于 1998年汛前开始 ,具有较高的控制性及测验精度。通过对实测资料的系统分析 ,阐述了床沙级配的沿程及沿深度的变化特点 ,并首次利用床沙级配 ,从新的途径分析计算得出 1998年 5月~ 1999年10月d <0 .0 3 1mm、d =0 .0 3 1~ 0 .0 62mm和d >0 .0 62mm的淤积量分别占全沙淤积量的 2 8.7%、43 .6%和 2 7.7%。
The surface and deep bed tests of the lower reaches of the Yellow River started before the flood season in 1998, with high controllability and testing accuracy. Based on the systematic analysis of the measured data, the features of bed-sand gradation along the course and along the depth are expounded, and the bed-sand gradation is used for the first time. From May 1998 to October 1999, d <0 was analyzed and calculated from the new way. The silt accumulation of 0 3 1mm, d = 0. 031 ~ 0 .0 62mm and d> 0. 62mm accounted for 2 8.7%, 43.6% and 2 7.7% of the total sediment deposition, respectively.
其他文献
根据小浪底水库的开发任务、初期水库输沙规律及黄河下游河道的演变规律 ,对初期运用满足防洪减淤、供水发电要求所需要的调控库容进行了分析 ,比较了不同调控库容调水、水库
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
小浪底水库设计阶段使用的原始库容是依据 1966年航测、 1970年调绘的 1∶1万地形图量算的。为了满足水库运用方式研究的需要 ,黄委设计院 1995年 5月航测了小浪底库区 1∶1
通过对龙羊峡、刘家峡水库实际调度资料的统计 ,在分析小浪底水库初步设计阶段调度模拟的基础上 ,提出了新的调度模拟方法 ,开发了模拟调度模型。模拟计算与实测资料较为吻合
小浪底水库受调水调沙和水库移民高程的限制,2000年汛期只有22.8亿m3的防洪库容,可以部分发挥拦洪作用。按照2000年黄河防洪任务和洪水调度原则,在分析研究小浪底水库和其他防洪
小浪底水库 2 0 0 0年运用方案试验结果表明 ,在拟定的运用方式下 ,库区基本上为异重流排沙 ,异重流的潜入条件符合原型观测资料及水槽试验得出的一般规律 ;库区干流为三角洲
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
利用小浪底至苏泗庄河段动床模型开展了有小浪底水库调节 (调控上限流量为 3 70 0m3 /s)和无小浪底水库两种方案的试验。研究了小浪底水库运用初期下游河道将出现的变化。此
在油品输送过程中,为了达到输送的效率,必须降低油品的损耗。各种不同的输送方式,引起油品的损耗是不同的。汽车罐装运输的油品,合理控制收发油时的损失,对于长距离管道输送
依据黄河下游来水来沙和断面冲淤实测资料 ,分析了 1998年 6月~ 2 0 0 0年 5月下游河道冲淤特性以及加密测验断面后对计算冲淤量的影响。结果表明 :这一时期枯水少沙 ,洪峰流