本文根据鲁新矿井场地地下水位高、冻土层厚等自然条件对施工的影响,对建筑工程地基基础施工方案进行优化,从而降低施工难度,加快施工进度。
Based on the influence of natural conditions such as high groundwater level and permafrost thickness on the construction of Lu Xin mine site, this paper optimizes the foundation construction program of the construction project so as to reduce the construction difficulty and speed up the construction schedule.