由江苏省水利勘测设计院设计的镇江港整治引航道工程,经省建委批准于1986年开工,1989年6月全部完成并通过验收,安全运行至今.该工程由引航道、港外拦沙堤和焦南坝组成.引航道长4000米,底宽120米,为一级航道.港外拦沙堤长7527米,堤顶高程6米,顶宽5米,堤坡1:4,作用是阻水拦沙.焦南坝长542米,堤顶高程6米,最大坝高13.5米,作用是封堵焦南航道,减少进港水量和淤积.施工中引航道采用水力冲挖和挖泥船疏浚相结合的施工组合;焦南坝选用电厂废煤焦碴为坝体腹部填料,用土工布在斜坡部位作粗细粒径材
Designed by Jiangsu Province Water Conservancy Survey and Design Institute of Zhenjiang Port Reclamation Road project approved by the Provincial Construction Committee approved the start in 1986, completed in June 1989 and passed the inspection, safe operation so far.This project by the waterway, port outside the sand barrier And the JiaoNan dam.The navigation channel is 4000 meters long and 120 meters wide at the bottom.It is a first-class waterway.It has a length of 7527 meters, an elevation of 6 meters, a top width of 5 meters, and a slope of 1: 4 Blocking water and sand blocking.JiaoNan dam length 542 meters, dike top elevation of 6 meters, the maximum dam height of 13.5 meters, the role is to block the South waterway to reduce the amount of water and siltation.Inch waterway construction using hydraulic excavation and dredging Ship dredging combination of construction; Jiao Nanba selected power plant waste coal coking ballast for the abdomen packing, with geotextiles in the slope for coarse-grained diameter timber