在四川灾区,恢复重建的困难超出想象,位于震中映秀镇的二台山变电站建设就是一个缩影。二台山变电站的地位如此之重要,使其无可替代地成为四川电网2009年开年抢建的一号工程;二台山变电站的建设工期如此之短,使得所有参建者都在凭借“特别能战斗、特别能吃苦、特别能忍耐、特别能奉献”的精神在“拼”;二台山变电站参战单位交叉作业如此之多,也使其协调工作的经验更显珍贵。
In the disaster areas in Sichuan, the reconstruction of the difficulties beyond the imagination, located in the epicenter Yingxiu Erzhongshan substation construction is a microcosm. The status of Er Taishan Substation is so important that it has become an irreplaceable project of No. 1 project of Sichuan Power Grid that was opened in 2009; the construction period of Er Taishan Substation is so short that all the participants are relying on “special Can fight, especially to endure, especially to be able to endure, in particular, dedication ”spirit in “ fight ”; Yishan substation war units so much cross-operation, but also make it more valuable experience of coordination.