由运输管理工程专业博士研究生毛保华为主承担的铁道部青年基金项目“运输枢纽规划一运输设备分阶段协调发展问题研究”,于1993年6月4日通过由北方交大组织的评审。该项目提出了运输设备分阶段协调发展中滚动式规划的新方法。专家认为,该项目对运输设备规划问题的研究在论理和实践方面都具有一定的深度和广度,所提出的滚动式规划方法,强调规划从运输需求和各种约束条件变化进行调整的观点,以及从设备发展最终规模制定调整规划的思路颇有新意.通过对各项运输设备间关系的分析,提出将设备划分相互制约的串联型与互为补充的并联型,并对串联型提出以延误作为设备间相互制约的主要观点;对
By the transportation management engineering doctoral student MAO Baohua primarily responsible for the Ministry of Railways youth fund project “transport hub planning a coordinated development of transport equipment research”, on June 4, 1993 by the North Jiaotong University organized the review. The project proposed a new method for the coordinated development of rolling equipment in transport equipment. Experts believe that the research on transport equipment planning in this project has a certain depth and breadth in both rationale and practice. The proposed rolling planning method emphasizes the planning’s view from the adjustment of transport needs and various constraints, and From the final development of equipment to adjust the planning of the development of quite innovative ideas.Based on the analysis of the relationship between the various transport equipment put forward the device type and mutual restraint each other in series and complementary parallel type, The main point of mutual restraint between equipment;