2012年,云南电网公司电网规划建设及物资专业口以南方电网公司中长期发展战略为指导,以务实、负责的态度,落实网、省公司年度工作会议精神和“十二五”规划,加快一体化管理体系建设,强化责任、效率和质量意识,又好又快地完成了年度工作任务,主要工作指标完成情况良好。(1)计划工作:基本完成全年工作任务。前期工作方面,可研批复率完成100%,项目核准完成率为92.4%。(2)基建工作:规范化水平显著提高,基建安全保持平稳,工程质量全面提升。500千伏通宝输变电工程被评为中国电力优质工程和南方电网优质工程,500千伏黄坪、
In 2012, under the guidance of the medium and long-term development strategy of the Southern Power Grid Company, the planning and construction of the power grid of Yunnan Power Grid Corporation and the material specialty port will be implemented with the pragmatic and responsible attitude and the spirit of the annual working conference of the provincial and provincial companies and the “Twelfth Five-Year Plan” Accelerate the construction of integrated management system, strengthen responsibility, efficiency and quality awareness, completed the annual work tasks well and quickly, and the main work targets were completed in good condition. (1) planning work: the basic completion of the annual work tasks. As for the preliminary work, the feasibility study and approval rate was completed by 100% and the project approval and completion rate was 92.4%. (2) Infrastructure work: The standardization level was significantly raised, the infrastructure safety remained stable and the quality of the projects was improved. 500 KV Tongbao power transmission project was rated as China Power Quality Project and China Southern Power Grid quality engineering, 500 kV Huang Ping,