论文部分内容阅读
一、枢纽概况可达枢纽工程是印度坎巴尔河梯级开发中四个梯级的最下一级,修建这个水利枢纽的目的是抬高水位,引水灌溉。左右岸两条总干渠,引水量分别为43及195秒立米,共可灌田840万亩。枢纽由浆砌块石溢流堰及土坝两部分组成,共长537米。溢流堰在河床左边,全长296米,右端和土坝相接,共分19孔,每孔淨宽12.2米,安装12.2米×
I. Pivotal Overview The reachable hub project is the lowest level of the four steps in the cascade development of the Kanbar River in India. The purpose of constructing this water conservancy hub is to raise the water level and divert water for irrigation. The two main trunk lines on the left and right bank, the water diversion volume were 43 and 195 seconds, a total of 8.4 million mu of irrigated fields. Hub by masonry stone overflow weir and earth dam in two parts, a total length of 537 meters. Overflow weir in the river bed on the left, a total length of 296 meters, the right end and earth dam phase, is divided into 19 holes, each hole net width of 12.2 meters, the installation of 12.2 meters ×