论文部分内容阅读
本局五九厂采取的综合性防尘毒措施分为两个阶段;1959至1972年为改进前阶段,此期由于厂房狭小、设备简陋、手工操作劳动强度大,缺乏防护措施和必须的卫生福利等设备。而后逐年对生产工艺进行改造和设备更新,增设了浴池和必需的劳保用品,按装了轮碾机(密闭)、装药机同时以管道抽气排除。用硫酸钠溶液洗手,药物内加油等措施。1973-1986
The integrated anti-personnel toxicant measures adopted by the 59th Factory of this Council are divided into two stages; from 1959 to 1972, the pre-improvement phase. Due to the small size of the factory building, the crude equipment and the heavy manual labor, the lack of protective measures and necessary health and welfare Other equipment. And then year after year to transform the production process and equipment updates, an additional bath and necessary labor insurance products, according to a wheel mill (closed), filling machine at the same time to exclude pipe exhaust. Wash hands with sodium sulfate solution, the drug refueling and other measures. 1973-1986