论文部分内容阅读
美国超导公司研制的36.5MW船舶推进用电机已经在费城海军商业中心的诺斯罗普格鲁曼实验室通过了工厂验收测试,并且即将交付海军使用。这个电机研制计划比原定的2006年底交货的日期推迟,其原因是为了修补电机上非超导部分的一
A 36.5 MW ship propulsion motor developed by AMSC has passed the factory acceptance test at Northrop Grumman Laboratory in the Philadelphia Navy Business Center and is about to be delivered to the Navy. This motor development plan was delayed from the original delivery date of the end of 2006, the reason is to repair a non-superconducting part of the motor