SECRAL(Superconducting ECR Ion Source with Advanced design in Lanzhou)magnet body was suc- cessfully fabricated and shipped to Lanzhou in 2005.The magnet was successfully ramped up to 100% its design current during the acceptance test at IMP.The 12 h stability test of the magnet at 95% of its design current provoke indicated the reliability of SECRAL superconducting magnet body.After the SECRAL test stand was assembled,the source was ignited at 18 GHz in August 2005.Preliminary commissioning
SECRAL (Superconducting ECR Ion Source with Advanced design in Lanzhou) magnet body was suc- cessfully fabricated and shipped to Lanzhou in 2005. Magnet was successfully ramped up to 100% its design current during the acceptance test at IMP. 12 h stability test of the magnet at 95% of its design current provoke indicated the reliability of SECRAL superconducting magnet body. After the SECRAL test stand was assembled, the source was ignited at 18 GHz in August 2005. Preliminary commissioning