介绍了宝浪油田表层地质情况与开发井载荷分布情况。重点阐述了“粉体喷射搅拌桩”与“生石灰桩”两种施工方法的原理、理论计算依据、施工工艺和现场应用情况;“粉体喷射搅拌桩”应用计算机软件进行设计,指导现场施工;“生石灰桩”则应用其较为成熟的技术在宝浪油田进行现场应用,这两种方法与现有的沉管浇法相比具有工艺简单、速度快、费用低等优点。在现场应用取得了较好的经济效益,具有较好的推广应用前景。
The surface geological conditions of Baolang Oilfield and the load distribution of development wells are introduced. The principle, theoretical calculation basis, construction technology and application of the two methods of “powder jet mixing pile” and “quick lime pile” are mainly elaborated. “Powder jet mixing pile” is designed by computer software to guide on-site construction; “Lime pile” is the application of its more mature technology in the Baolang oil field applications, these two methods compared with the existing pipe pouring method has the advantages of simple process, high speed, low cost. In the field application has achieved good economic benefits, with good prospects for the promotion and application.