论文部分内容阅读
近日,世界上最快的高铁,设计时速350公里的武广线开始试运行。武广线是铁路客运专线项目6条线之一,作为这个项目的不间断电源供应商——来自以色列的GA,一直关注项目进展情况。为了保障整个线路的客运服务系统的顺畅运行,项目采用了Power+系列模块UPS,功率段从30k到100k不等。庞大的服务系统包括了票务系统、旅客服务信息,以及办公自动化、一卡通管理系统、货运管理系统在内的各信息系统。Power+采用了CMM整流控制、联机电池
Recently, the world’s fastest high-speed rail, design speed of 350 km Wuhan-Guangzhou line began trial operation. Wuhan-Guangzhou railway line is one of the six lines of passenger dedicated railway project, as the project’s uninterruptible power supply provider - from Israel’s GA, has been concerned about the progress of the project. In order to ensure the smooth operation of the passenger service system of the entire line, the project adopts the Power + series module UPS, and the power segments range from 30k to 100k. A huge service system includes the ticketing system, passenger service information, as well as office automation, card management system, cargo management system, including the information system. Power + adopts CMM rectification control, on-line battery